Practical advice on additions, basements, roofing and finish work from the Montocon General Contractor team.
The design is the fun part. What actually decides your timeline is the setback rules, the permit queue and whether your foundation can carry what you want to put on it.
A finished basement that was framed over a damp slab is a mould problem with a nice floor on top. The order of operations is the whole job.
Not every leak means a new roof, and not every intact-looking roof has time left. Here is what actually decides it.
Freeze-thaw is hard on a deck. The boards are the cheapest thing to replace; the footings are the thing that makes it solid in ten years or spongy in three.
Siding is not waterproof and was never meant to be. The layer behind it is what keeps the wall dry — and it is the layer most often skipped.
Two crews can use the same paint on the same wall and get results five years apart. The difference happened before the lid came off.